SCADA & power systems for high-efficiency CBG plants.
Royal Infra Projects delivers the electrical power systems and SCADA monitoring that help compressed biogas plants hold steady, high-efficiency output — live visibility of power and process, early alarms, and the energy data to keep the plant at its best.
One screen for the whole plant.
A CBG plant runs around the clock on feedstock handling, digestion, gas cleaning, upgrading and compression. Every stage depends on the same electrical system, so we engineer the power backbone and the SCADA layer together.
- Power monitoring & control room — operator stations, panels and displays commissioned in the plant control room.
- Electrical power distribution — HT incomer, transformers, MCC/PCC panels and cabling engineered to the plant load.
- Field-to-control integration — signals from drives, meters and protection relays brought into SCADA.
- Alarms, interlocks & trending — alarm handling, trip interlocks and historical trends.
- Energy & load monitoring — metering of the plant's own consumption to lift net efficiency.
- Commissioning & handover — testing, documentation and operator familiarisation.
What SCADA changes in daily operation
Visibility
Every motor, pump, blower and compressor on one screen, so the plant is run on data rather than rounds.
Early warning
Alarms and trends flag a developing problem before it costs gas output or trips the plant.
Energy discipline
Metering of the plant's own power use shows where consumption can be trimmed, lifting net efficiency.
The rest of the network we build.

HT Transmission Line Construction
Route survey, tower and pole erection and conductor stringing for 11kV to 66kV overhead lines.
Explore capability →

66kV Substations & Feeder Bays
Bus systems, switchgear bays, protection panels and control rooms from 11kV to 66kV.
Explore capability →

Street Lighting & Public Infrastructure
LED street lighting, pole erection, feeder pillars and smart lighting controls.
Explore capability →

Industrial Electrification & Smart Energy Management
Internal HT/LT distribution, power factor correction and energy monitoring that cut costs.
Explore capability →

Solar & Renewable Energy Integration
Rooftop and ground-mount solar EPC, grid interconnection and hybrid-ready systems.
Explore capability →

Energy Audit & Efficiency Solutions
Electrical energy audits and loss-reduction programmes for municipalities and government.
Explore capability →
Common questions on this capability
What does SCADA do in a compressed biogas (CBG) plant?
SCADA brings the plant's electrical and process signals onto one monitoring and control system. Operators see power distribution, motors, pumps, blowers and compressors in real time, receive alarms and trends, and can hold the plant at its best operating point rather than reacting to trips and faults.
How does SCADA help a CBG plant reach higher output?
Early alarms and trending catch drifts before they reduce gas output or cause a shutdown, interlocks protect critical equipment, and energy and load monitoring shows where the plant's own power consumption can be trimmed, which improves net efficiency.
Do you also deliver the electrical power system around the SCADA?
Yes. We engineer and install the HT and LT power distribution, panels, earthing and cabling that the control system depends on, so the electrical backbone and the monitoring layer are delivered together.
Planning a CBG plant, or upgrading its controls?
Tell us the plant capacity, stage and timeline and we'll come back with a scope and cost.